Preparing the server for rack installation
Procedure
- Power down the server.
-
Remove all power:
- Disconnect each power cord from the power source.
- Disconnect each power cord from the server.
- Disconnect all peripheral cables from the server.
-
If installed, unlock and remove the security padlock and/or the Kensington security lock.
For more information, see the lock documentation.
- Place the server on the side and access panel facing up.