Preparing the server for rack installation

Procedure
  1. Power down the server.
  2. Remove all power:
    1. Disconnect each power cord from the power source.
    2. Disconnect each power cord from the server.
  3. Disconnect all peripheral cables from the server.
  4. If installed, unlock and remove the security padlock and/or the Kensington security lock.

    For more information, see the lock documentation.

  5. Place the server on the side and access panel facing up.