Powering up the server blade

Server blades can be powered up individually in the chassis. Choose the procedure that fits your need.

When each server blade is installed into a powered chassis, auxiliary power is automatically provided to the blade, which powers the blade iLO module.

Use one of the following methods to power on server blades:

Verify that the server blade is powered on by observing that the system power LED is green. See Server blade LEDs.