Preparing the server for operation

Procedure
  1. Install any options or cables previously removed to access the TPM connector.
  2. If removed, install the air baffle.
  3. Install the access panel.
  4. Install the front bezel.
  5. Do one of the following:
  6. Connect all peripheral cables to the server.
  7. Connect the power cords:
    1. Connect each power cord to the server.
    2. Connect each power cord to the power source.
  8. Power up the server.

The installation is complete.