Installing the P416ie-m controller mezzanine option

IMPORTANT:

For more information about the association between the mezzanine bay and the interconnect bays, see the HPE Synergy 12000 Frame Setup and Installation Guide in the Hewlett Packard Enterprise Information Library (https://www.hpe.com/info/synergy-docs). Where you install the mezzanine card determines where you must install the interconnect modules.

Procedure
  1. Power down the compute module.
  2. Remove the compute module.
  3. Place the compute module on a flat, level work surface.
  4. Remove the access panel.
  5. Locate the appropriate mezzanine connector. To locate the connector, see System board components.
  6. Remove the drive cage.
  7. Install the mezzanine card. Press firmly on the PRESS HERE label above the mezzanine connector to seat the card.
    Installing the mezzanine card
  8. If a SLIM/SAS cable is present, install and route the SLIM/SAS cable for the P416ie-m SR Gen10 controller from the drive assembly to the HPE Smart Array P416ie-m Controller Port 3i of the mezzanine card in mezzanine 1.
    Key points of the SLIM/SAS cable highlighted
  9. Install the access panel.
  10. Install the compute module.
  11. Power up the compute module.